How we work

We start planning from your delivery date and work backwards. There are seven stages. Each stage has a date, a person responsible, and documents on file before the next stage starts.

Reviewing the production plan together
Seven stages with approvals

Nothing moves forward without approval

See the full service scope
01

Discover

We take your brief: the product, the quantity, the target price and the delivery date.

Range briefTrend readTarget costing
Gate
Brief signed off
Owner
Merchant + design
Evidence
Dated brief on file
Range brief and colour direction being reviewed
02

Develop

We send back the tech pack, materials list and price. We agree the construction and trims before we book anything.

Tech packBOMCosting sheet
Gate
Costing approved
Owner
Product development
Evidence
Version-controlled pack
Tech pack sketching with fabric swatches
03

Sample

We make samples until you approve them. Lab dips and wash standards are checked under the correct light.

ProtoFit / size setPP sample
Gate
PP sign-off
Owner
Merchant + QA
Evidence
Signed PP comments
Sealed swatch and colour standards
04

Source

We book the factory and materials for your delivery date. We match the factory to the product and the season.

Factory allocationFabric bookingTrim PO
Gate
Capacity locked
Owner
Sourcing
Evidence
Signed PO + T&A
Fabric roll inspection before booking
05

Produce

We follow production against the plan. Our inspectors are on the line from the first pieces.

Line loadingDaily WIPInline QC
Gate
DUPRO clear
Owner
Production + QA
Evidence
Inline reports
Bulk fabric on the spreading table
06

Deliver

Final inspection, packing, documents and export. Nothing ships with an open defect.

Final AQLDocs packConsolidation
Gate
Final inspection passed
Owner
QA + logistics
Evidence
Inspection certificate
Final inspection and cartons ready for export
07

Review

A report after delivery, plus support for claims and repeat orders. This prepares the next season.

Vendor scorecardClaims reviewReorder plan
Gate
Season closed
Owner
Merchant
Evidence
Scorecard on file
Post-season scorecard review
05
Approval gates

Five approvals before shipment

Every approval has a date, a document and a person responsible. Nothing is agreed by phone only.

01 Brief sign-off Category, volume, target price and ship date agreed in writing.
02 Costing approval BOM, consumption and FOB signed before capacity is booked.
03 PP sign-off Fit, colour under specified light, wash standard and trim card sealed.
04 DUPRO clearance During-production inspection cleared before bulk continues.
05 Final inspection AQL 2.5 / 4.0 passed and documented before shipment release.
Communication rhythm

You always know where your order is

One contact person. A progress report on the same day every week. And a clear process if a date is at risk.

1
One contact person
Weekly
WIP report, fixed day
Merchant working through order status at the packing desk
Starting a program

We need three things to start

Category and construction

A sketch, a sample garment or a tech pack. Whatever you have.

Volume and target price

Per style and per colour, so we can give you a correct price the first time.

Ship date

The date we plan everything else from.

Send us your delivery date

We reply with the full schedule, the approval stages and the team responsible.